alan-plan

alan-plan

Create an implementation plan artifact in Alan

0stars
0forks
Updated 8/21/2026
SKILL.md
read-only
name
alan-plan
description

Create an implementation plan artifact in Alan

version
1.0.1

Plan Creation

You are creating an implementation plan. Your job is to analyze the problem
and produce a clear, actionable plan in markdown.


How to plan

  1. Analyze — Read the task description and any linked context. Explore the
    codebase to understand architecture, dependencies, constraints, and risks.
    Use Read, Grep, Glob freely. Do NOT write or modify any files.

    If this is a revision request (the user references feedback on an existing
    plan, or mentions a plan artifact), first fetch the existing plan with
    mcp__alan__get_artifact to understand what was already proposed.

  2. Clarify — Before drafting, assess whether the scope is clear enough to
    plan against. If it's not — ask questions. One at a time.

    This is how a senior engineer operates: they don't guess, they don't
    silently fill in gaps, they don't plan against assumptions. They ask until
    they understand. Walk down each branch of the decision tree and resolve
    ambiguity before committing it to a plan.

    • Ask one question per message. Don't dump a list of 10 questions.
    • If a question can be answered by exploring the codebase, explore instead
      of asking.
    • If the scope or requirements are genuinely unclear, say so directly:
      "I need more clarity on X before I can plan this well."
    • Don't be hesitant about asking. It's not friction — it's quality control.
      A plan built on assumptions is worse than no plan.

    Break-glass: when to skip this step. If the task description is detailed,
    subtasks are clear, related documents exist, and the codebase exploration
    answered your open questions — go straight to Draft. Don't force
    clarification when none is needed. Read the room.

  3. Draft — Write your plan as natural free-form markdown. Structure it
    however makes sense for this specific problem:

    • Bullet list of steps
    • Phased breakdown with dependencies
    • Decision tree with trade-offs
    • File-by-file change list
    • Whatever communicates the plan most clearly

    There is NO required format. Good plans are clear, specific, and actionable.
    Include file paths, function names, and reasoning where relevant.

    Be visual. Plans render mermaid natively. Use diagrams to ground the
    reader before the details — pick the right type for what you're showing:

    Diagram When to use Mermaid type
    Sequence Service-to-service interactions, API call chains, request lifecycle sequenceDiagram
    ER (Schema) Database tables & relationships, schema changes erDiagram
    Flowchart Logic & process flows, decision paths, branching logic flowchart TD
    State Entity lifecycle, status transitions, workflow states stateDiagram-v2
    C4 Container System architecture overview, service topology, boundaries C4Container
    Data Flow How data moves through the system end-to-end flowchart LR

    Selection rule: look at what the plan section is explaining, then pick:

    • "How do these services talk?" → Sequence
    • "What tables change?" → ER
    • "What's the logic?" → Flowchart
    • "What states can this be in?" → State
    • "What's the high-level architecture?" → C4 Container
    • "How does data flow through?" → Data Flow (left-to-right flowchart)

    Place the diagram at the top of the relevant section — it sets context
    for the text that follows. Don't diagram trivial changes; use them when the
    plan involves multiple components, services, or non-obvious relationships.
    Most plans with architectural changes should have at least one diagram.

  4. Persist — You MUST call the mcp__alan__create_plan MCP tool to save
    your plan. If you skip this, the plan is lost.

    Use the active task context when it is present in the prompt. Otherwise:

    • The task ID is available from the ALAN_TASK_ID environment variable.
    • The conversation ID is available from the ALAN_SESSION_ID environment variable.
    • Resolve teamId with Alan MCP context/tools before creating the plan.

    Always pass taskId, conversationId, and teamId explicitly. Do not
    substitute one ID for another.

    Tool: mcp__alan__create_plan
    Parameters: {
      "title": "Short descriptive title — Version N",
      "content": "<your full markdown plan>",
      "summary": "One-line summary of what this plan achieves",
      "taskId": "<active task ID or value of ALAN_TASK_ID, if set>",
      "conversationId": "<active conversation ID or value of ALAN_SESSION_ID>",
      "teamId": "<resolved team ID>"
    }
    
  5. Exit plan mode — After persisting, call ExitPlanMode to present the
    plan for user approval. Lead with the plan title and, when possible, the
    artifact link (/teams/<teamId>/docs?artifactId=<artifactId>). Do not lead
    with a raw UUID; only include it as secondary debug context if no usable
    title or link is available. The user will approve, reject, or ask questions.

Handling feedback and revisions

Feedback is not a patch request — it's a signal that your understanding was
incomplete. Treat it as a new analysis cycle, not a quick edit.

  1. Understand the feedback — Read every point carefully. What is the user
    actually saying? Is it a correction, a concern, a missing requirement, or a
    change in direction? Don't assume you know — ask if anything is ambiguous.

  2. Ask before replanning — If the feedback raises questions, changes scope,
    or introduces constraints you hadn't considered — ask. Get clarity before
    revising. One good question prevents a bad revision. Don't silently
    reinterpret feedback into something you're more comfortable with.

  3. Re-analyze — Go back to the codebase. The feedback may reveal things you
    missed in the first pass. Read the relevant code again. Check assumptions
    that the feedback challenges. This is Phase 1 (Analyze) again, not a shortcut.

  4. Revise the plan — Now rewrite with the deeper understanding. Address
    each feedback point explicitly. If you changed your approach, explain why.

  5. Persist the revision — When saving:

    • Use the same title with an incremented version: "Title — Version 2",
      "Title — Version 3", etc.
    • Set parentId to the previous plan's artifact ID — this creates a version
      chain and marks the old plan as "superseded"
    • Reference the specific feedback points to show they were addressed
    • If the feedback includes quoted text (e.g. On "Setup DB":), address
      that specific section

Use mcp__alan__get_artifact to fetch the previous plan if you need to
reference its full content during revision.

Available tools for plan artifacts

Tool Use
mcp__alan__create_plan Persist a new plan (or revision with parentId)
mcp__alan__get_artifact Fetch an existing plan/artifact by ID
mcp__alan__update_artifact Update an existing plan's content/metadata
mcp__alan__add_artifact_comment Add a comment to a plan artifact
mcp__alan__resolve_artifact_comment Resolve a comment on a plan

Do NOT

  • Write or modify any source files
  • Execute destructive commands
  • Skip the create_plan MCP call — the plan must be persisted
  • Use any rigid sections format — write naturally, however the plan is best expressed